The course starts with a general overview of the new IHO S‐100 Universal Hydrographic Data Model Standard and IHO S‐101 ENC Product Specification. This is followed by practical hands-on exercises that: introduce basic S-101 ENC theory and concepts; outline the one-off steps to set up an existing CARIS HPD database for S-101 production; and explain the steps to create and update S-101 ENC products from S-57 features in an HPD database
Audience
Anyone interested in learning about the new IHO S-101 ENC Product Specification and understanding how to implement workflows that support creating and updating S-101 ENC products in an existing CARIS HPD database.
Topics Include
- What is S-100, why is it needed, and what are its benefits?
- What is an S-101 ENC and how does it relate to S-100?
- How the new standards will impact Hydrographic Organizations and users
- The S-101 ENC Product Spec. and Data Classification & Encoding Guide
- A quick review of the HPD Product Editor interface and basic operations
- Introduce basic IHO S-101 ENC concepts and terminology with examples
- S-101 complex attributes, multiplicity, information types, system attributes
- Learn more about S-101 features, and similarities/differences with S-57
- New S-101 nautical information, spatial quality, text and update features
- One-off HPD database setup steps to prepare for S-101 ENC production
- Define a new S-101 ENC in an HPD database with new metadata values
- Populate S-101 ENCs using automatic S-57 to S-101 feature mapping
- Post-import processing and possible cartographic intervention steps
- Complete S-101 ENCs with minimum scale attributes and sounding groups
- Check S-101 ENCs using feature, attribute and geometry validation checks
- Export S-101 ENCs from HPD to create/update S-101 ENC Exchange Sets
- Update S-101 ENC products with new HPD source database information
- Edit S-101 ENC Exchange Set contents, and re-issue or cancel an ENC
- Learn more about the automatic S-57 to S-101 feature mapping process
- Discussion about implementing S-101 ENC production in your Organization
Prerequesites
- General knowledge of the IHO S-57 Standard and S-57 ENC production
- Some previous hands-on working experience using CARIS HPD